According to the characteristics of the hospital's building and technology, the hospital's logistics traffic and garbage transportation line is planned as a whole.

line

2024-03-14

The hospital is an old hospital logistics renovation project, in the absence of additional space in the hospital, the designer, according to the hospital building structure and functional layout, utilizes the external glass curtain wall to recreate the vertical lifting system and uses the connecting corridor to solve the horizontal transmission problem.

line

2024-03-14

According to the characteristics of the hospital building, the characteristics of the process of the overall planning of the hospital's logistics traffic, garbage and clothing transportation line.

line

2024-03-14

Combined with the architectural features of the hospital building, the box-type logistics system is used for the transportation of materials within the hospital.

line

2024-03-14

According to the characteristics of the hospital building, the characteristics of the process of the overall planning of the hospital's logistics traffic line, choose to use advanced modern logistics systems to optimize the hospital traffic flow.

line

2024-03-14

Clean and dirty integrated overall solution system covers: rail trolley logistics, pneumatic logistics, dirty clothes and uniforms collection system site configuration: 74 rail trolley logistics sites, 26 pneumatic logistics sites, 64 uniforms sites are set up in the whole hospital.

line

2024-03-14