Information Details
Shanghai University of Traditional Chinese Medicine Longhua Hospital Pudong Branch
Release time:
2023-12-13 09:50
Hospital name: Shanghai University of Traditional Chinese Medicine Longhua Hospital Pudong Branch
Hospital scale: the project is implemented in two phases, with 500 beds in the first phase and 320 beds in the second phase, with a total construction area of 76,550 square meters, Grade IIIA.
System coverage: medium-sized box logistics, garbage and clothing classification and collection system, medical waste robots
Solution:
Medium-sized box-type logistics: 30 box-type logistics stations have been set up throughout the hospital; the box-type logistics realizes fully automatic delivery of medicines, consumables, specimens, logistic materials, meals, etc., which alleviates the pressure of the hospital's human and logistic flows in the hospital's traffic flow line during the peak period.
Garbage and quilt: as a non-medical garbage collection system, it is distributed in each standard ward and outpatient building area, and 51 garbage and quilt delivery ports are set up in the whole hospital, of which 15 are quilt delivery ports, 18 are dry garbage delivery ports, and 18 are wet garbage delivery ports.
Medical waste: medical waste collection system, distributed in each standard ward, outpatient building area, a total of 3 medical waste robots are set up to collect medical waste.
Typical Case Study