The project is implemented in two phases, with 500 beds in the first phase and 320 beds in the second phase, with a total construction area of 76,550 square meters, Grade IIIA.

line

2023-12-13

According to the transportation needs and characteristics of the inpatient pharmacy and operating room, three integrated handling models are equipped to mainly solve the transportation of materials within the operating room, the inpatient pharmacy to the various wards of the batch infusion drug delivery and so on.

line

2022-09-22